Project | : | Infrastructure |
---|---|---|
Location | : | Dubai, United Arab Emirates |
Client | : | COWI|BESIX|Dubai Municipality |
Services Provided: Design Validation, Utility Diversions, Access Management Services and Engineer of Record
First of its kind in the Middle East, this is a prestigious and strategic project in Dubai estimated at that AED 1.5 billion, with a construction period of around 1,200 days. The project objective is to have a long-term solution for collecting and conveying groundwater and storm water runoff from the Dubai World Central area (about 135 km2) and its adjacent communities (about 245 km2), which will be discharged into the Gulf. The project consists of a 10km tunnel of 11.05m boring diameter, at 30-45m below ground. The tunnel has 4 deep shafts, linking the connection-chambers with the tunnel and subsequently with the main collection drainage network.
Jouzy’s scope of work included overall design validation, utilities corridors for tunnel alignment
Our professional experts will be happy to assist you in building a better world
© 2020 Jouzy Consulting Engineers All Right Reserved.